QUALITY BUILT
INTO THE PROCESS.
QUALITY
Inspection & Test Plans · Hold Points · Substrate Inspections · Material Approvals · Technical Data Submissions · Product Documentation · Installation Records · Inspection Records · Defect Management · Handover Documentation
SAFETY
Project-Specific SWMS · SDS Management · Hazard Identification · Hierarchy of Controls · Product Risk Assessment · Site-Specific Procedures · Workforce Consultation · PPE Requirements · Builder Site-System Compliance
TECHNICAL SUBMISSIONS
Clear, project-specific documentation supporting coordinated commercial surface delivery.

CONTROLLED FROM PRE-START
TO HANDOVER.
CERAMAFIX integrates quality assurance, technical documentation and site safety into the delivery of each commercial package. Inspection points and installation records provide a clear and traceable process from substrate acceptance through to completed works.
QUALITY & SAFETY CONTROLS.
A structured commercial process that supports quality installation, technical accountability and safe delivery from pre-start through to handover.
01
PRE-START & SITE READINESS
Substrate and work-area inspections, access requirements, preceding trade interfaces and readiness checks before installation commences.
02
INSPECTION & TEST PLANS
Project-specific ITPs, inspection stages, hold points and documented verification throughout installation.
03
MATERIAL & SYSTEM APPROVALS
Technical data submissions, SDS documentation, product approvals and manufacturer-supported system information.
04
INSTALLATION QUALITY CONTROL
Substrate preparation, waterproofing, screeding, adhesive coverage, movement joints, finishes and installation records.
05
SITE SAFETY & SWMS
Project-specific SWMS, hazard identification, hierarchy of controls, PPE requirements, site procedures and workforce consultation.
06
DEFECTS & HANDOVER
Inspection records, defect management, rectification tracking and coordinated quality documentation for project handover.
DOCUMENTED. INSPECTED. ACCOUNTABLE.
Quality is not treated as a final inspection. It is managed progressively through planning, product selection, installation, inspection and handover.
TYPICAL PROJECT DOCUMENTATION
ITPs • Pre-Start & Site Readiness Inspections • Technical Data Submissions • Product Approvals • SDS • SWMS • Inspection Records • Defect Close-Out • Handover Documentation
QUALITY DOCUMENTATION FOR YOUR NEXT PROJECT.
Discuss project-specific ITP, technical submission, QA and safety requirements with CERAMAFIX.
